Before you look at your next project
Rules around the 70sqm granny flat
Maximum floor area: Up to 70 square metres
Single-storey only, with a maximum building height of 4 metres from the ground
Must sit at least 2 metres away from property boundaries and any other buildings on the site.
Must use a simple design with lightweight frames (timber or light steel) and lightweight roofs.
Building work that doesn't need a building consent
There are many building projects that don't require a building consent, which makes it easier and faster for New Zealanders to get on with certain building projects. Find out all the information you need to know before you start building work that is exempt from the building consent process, including who you should engage to do the work, what rules to follow and where to go to for advice.
Building consent exemptions for work carried out or supervised by an LBP
There are several projects that can be done without needing a building consent if they are carried out or have the design and construction supervised by a Licenced Building Practitioner